Potholes and structural failures don't wait — neither do we. Commercial asphalt patching statewide, coordinated through our vetted specialist network. Saw-cut, mill, and hot-mix repairs that last.
| Factor | Throw-and-Go Cold Patch | Saw-Cut Hot-Mix (What We Use) |
|---|---|---|
| Lifespan | 6–18 months before failure | 5–10 years with proper base prep |
| Method | Cold asphalt poured into hole, tamped by hand | Saw-cut edges, remove failed material, compact base, hot-mix install |
| Structural integrity | None — doesn't bond to existing pavement | Full bond — flush, mechanically compacted |
| Liability risk | High — fails quickly, creates trip hazards again | Low — clean flush repair, documented work |
| Cost over 5 years | Higher — 3–4 re-patches in same period | Lower — one repair done right |
Saw-cut and hot-mix repair for active potholes — eliminating vehicle damage liability and trip hazards before they worsen.
Full-depth removal of structurally failed asphalt with base correction and hot-mix replacement. The only permanent fix for fatigue cracking.
Perimeter crumbling, edge failure, and apron damage repaired to restore drainage and prevent further base erosion.
When widespread surface distress exists but the base is sound, an asphalt overlay restores smoothness and extends pavement life.
Depression and birdbath repairs that collect standing water — Florida's rain makes these especially damaging to untreated asphalt.
Uneven surfaces and damaged accessible routes repaired to current ADA standards — protecting against non-compliance liability.
We evaluate failure type, extent, and root cause — drainage issues, base failure, or surface-only deterioration — before recommending a scope.
Itemized repair scope with method, square footage, and pricing. No vague verbal estimates. You review and approve before any work begins.
Failed asphalt is saw-cut to clean edges, removed, and base is inspected. Any subbase issues are corrected before the patch goes in.
Commercial-grade hot-mix asphalt installed and mechanically compacted flush — structurally sound and clean-looking from day one.
One call coordinates commercial asphalt patching at any Florida property — through our vetted specialist network statewide.
The professional repair method: damaged asphalt is cut to clean edges, failed material removed, base compacted, and commercial hot-mix asphalt installed flush. Produces structural repairs that last 5–10 years vs. cold-patch's 6–18 months.
If less than 25–30% of the surface is damaged and the base is sound, patching is more cost-effective. Widespread base failure or extensive fatigue cracking may warrant full repaving. We give honest assessments, in writing, before recommending anything.
A properly installed saw-cut hot-mix patch lasts 5–10 years in Florida's climate. Cold-patch repairs typically fail within 6–18 months, especially under Florida's heat and UV exposure.
Yes. Unaddressed potholes and deteriorated surfaces can result in vehicle damage claims, trip-and-fall liability, and ADA non-compliance exposure. Prompt repair with documented written work orders is the safest approach.
Get a detailed written repair estimate for your Florida property within 48 hours. No obligation, no pressure.
Request a Quote →